Other | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | PASS |
Dan Ediger
|
|
|
This has passed inspection. Please let me know what i need to do to close it out. Thank you Inspection requested via web by Andrea Grigsby
|
Final | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | PASS |
Dan Ediger
|
|
|
This has passed inspection. Please let me know what i need to do to close it out. Thank you Inspection requested via web by Andrea Grigsby
|
CHANGE STATUS TO (I) | | | 8/29/2017 | | DONE |
|
|
|
as per Eric Strole change status was finaled byu mistake
|
Final | 8/22/2017 | 8/23/2017 | 8/23/2017 | A | PASS |
Dan Ediger
|
|
|
Call Mary ###-#### 30 minutes prior to arrival. (Mech inspection as well) Phone #: ###-#### Inspection requested via web by Andrea Grigsby
|
Final | 8/16/2017 | 8/18/2017 | 8/18/2017 | P | FAIL |
Dan Ediger
|
|
|
Contact Jeff Burch prior to arrival 30-45 minutes ahead. at ###-#### Phone #: ###-#### Inspection requested via web by Andrea Grigsby. The water re-pipe is ok to cover. The water heater drian pan is too small and is cutting off the combustion air. I notified the contractor and turned the gas valve to pilot. The flame is floating and not getting air. contractor did not install but will return to the job today.
|
Issue PAID IN FULL permit | | | 8/16/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/16/2017 | | DONE |
|
|
|
This permit was created on the web by Andrea Grigsby
|