Final | 2/8/2018 | 2/8/2018 | 2/8/2018 | P | PASS |
Daryl Spivey
|
|
|
Brad Phone #: ###-####
|
Final | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | PART |
Bill VanDegrift
|
|
|
Bradon Phone #: ###-#### master bath isn't ready yet.
|
Final | 9/7/2017 | 9/8/2017 | 9/8/2017 | A | CANC |
Dan Ediger
|
|
|
Brad-husband-would like after 10 if possible Phone #: ###-####. Changed to rough-in
|
Plumbing Rough-in | 9/8/2017 | 9/8/2017 | 9/8/2017 | A | PASS |
Dan Ediger
|
|
|
Brad-husband-would like after 10 if possible Phone #: ###-####
|
Plumbing Rough-in | 9/1/2017 | 9/5/2017 | 9/5/2017 | A | PART |
Daryl Spivey
|
|
|
Brad Reardon Phone #: ###-#### water ok.......still has some waste to plumb.........ds
|
Application received | | | 8/31/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/31/2017 | | DONE |
|
|
|
|