First Notice | 12/21/2017 | 12/21/2017 | 1/10/2018 | | DONE |
Bill VanDegrift
|
|
|
This permit finaled on the web by Joseph Corcoran
|
Final | 12/21/2017 | 12/21/2017 | 12/21/2017 | P | PASS |
Bill VanDegrift
|
|
|
gw only
|
Groundwork | 10/9/2017 | 10/9/2017 | 10/9/2017 | P | PASS |
Eric Strole
|
|
|
Concrete sleeves set per request. Thanks Phone #: ###-#### Inspection requested via web by Joseph Corcoran
|
Groundwork | 10/8/2017 | 10/9/2017 | 10/9/2017 | A | FAIL |
Eric Strole
|
|
|
5lb test on ground work and 3" clean out installed per request. Phone #: ###-#### Inspection requested via web by Joseph Corcoran-Need approved stamped city plans on site for inspection.
|
Groundwork | 10/5/2017 | 10/6/2017 | 10/6/2017 | A | FAIL |
Eric Strole
|
|
|
Toilet and floor sink groundwork rough in drain only. Phone #: ###-#### Inspection requested via web by Joseph Corcoran-Need approved plans on site. Need full size clean out. Need to test dwv.
|
Groundwork | 9/18/2017 | 9/19/2017 | 9/19/2017 | A | PART |
Eric Strole
|
|
|
Ground work stubbed into the building drainage only. Phone #: ###-#### Inspection requested via web by Joseph Corcoran-Sewer stub into building pass.
|
Other | 9/13/2017 | 9/14/2017 | 9/14/2017 | A | DONE |
Eric Strole
|
|
|
Preliminary before we begin plumbing work. Phone #: ###-#### Inspection requested via web by Joseph Corcoran-Questions on dwv
|
Issue PAID IN FULL permit | | | 9/13/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 9/13/2017 | | |
|
|
|
|
Application received | | | 9/13/2017 | | DONE |
|
|
|
This permit was created on the web by Joseph Corcoran
|