Final | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 7/12/2018 | 7/13/2018 | 7/13/2018 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. This is a final inspection. The floor drain in the garage must be have a trap primer and strainer or perm capped. This is the second failure notice for this item
|
Final | 7/2/2018 | 7/3/2018 | 7/3/2018 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. Install a grate and trap primer on the garage floor floor drain. The drain is full of trash and not primed.
|
Plumbing Rough-in | 7/2/2018 | 7/3/2018 | 7/2/2018 | P | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Johansen Inspection cancelled from web by: Brian Johansen
|
PLM-Aging Inspection | 6/14/2018 | 6/14/2018 | 6/14/2018 | | PEND |
Dan Ediger
|
|
|
|
Plumbing Rough-in | 1/24/2018 | 1/25/2018 | 1/25/2018 | P | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. Already inspected
|
Plumbing Rough-in | 12/4/2017 | 12/4/2017 | 12/4/2017 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen ri ok
|
Plumbing Rough-in | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen 1) water to water in exterior wall 2) move water in 1/2 bath to the face of the wall 3) complete framing at shower and secure piping
|
Groundwork | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | CANC |
Dan Ediger
|
|
|
is ready so if you would like to it can be an am inspection Phone #: ###-#### Inspection requested via web by Brian Johansen. Groundwork already done
|
Groundwork | 10/2/2017 | 10/3/2017 | 10/3/2017 | A | NR |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Groundwork | 9/25/2017 | 9/26/2017 | 9/26/2017 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Issue PAID IN FULL permit | | | 9/25/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/25/2017 | | DONE |
|
|
|
This permit was created on the web by Brian Johansen
|