Water and/or Sewer | 11/14/2017 | 11/15/2017 | 11/15/2017 | A | PASS |
Dan Ediger
|
|
|
Keth Phone #: ###-####
|
DOC - Permit Finaled | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | PASS |
Dan Ediger
|
|
|
|
Water and/or Sewer | 11/2/2017 | 11/3/2017 | 11/3/2017 | A | FAIL |
Dan Ediger
|
|
|
water // Keith Phone #: ###-####. The water services require a pressure test prior to backfill. Verify sizing with the fixture unit load on the houses. Backfill with clean soil.
|
Issue PAID IN FULL permit | | | 11/1/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/1/2017 | | DONE |
|
|
|
This permit was created on the web by Dawn Brubaker
|