Final | 1/11/2018 | 1/11/2018 | 1/11/2018 | P | PASS |
Dan Ediger
|
|
|
The work by this plumber complete.
|
Final | 1/10/2018 | 1/11/2018 | 1/11/2018 | P | CANC |
Dan Ediger
|
|
|
Lock Box code 0726 Phone #: ###-#### Inspection requested via web by Ryan Baker. Front entrance closed off. Reschedule when house is avaiable for entrance
|
Final | 1/4/2018 | 1/8/2018 | 1/8/2018 | P | FAIL |
Dan Ediger
|
|
|
Lock box code 0726 Phone #: ###-#### Inspection requested via web by Ryan Baker. 1. The dishwasher drain must rise to the highest point in the cabinet. 2.. Only one slip-joint is allowed on the outlet side of the weir. 3. Pipe the water heater t&p outside of the closure. 4. Each flue joint on the water heater must have 3 screws. 5. Add a 3" drip leg to the water heater gas feed.
|
Plumbing Rough-in | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | PASS |
Dan Ediger
|
|
|
LOCK BOX CODE 0726 Phone #: ###-#### Inspection requested via web by Ryan Baker
|
Issue PAID IN FULL permit | | | 11/15/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/15/2017 | | DONE |
|
|
|
This permit was created on the web by Ryan Baker
|