Final | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | PASS |
Matt Wrobel
|
|
|
Cesar Phone #: ###-####
|
PLM-Aging Inspection | 8/6/2019 | 8/6/2019 | 8/6/2019 | | PART |
Matt Wrobel
|
|
|
wip
|
PLM-Aging Inspection | 5/7/2019 | 5/7/2019 | 5/7/2019 | | PART |
Matt Wrobel
|
|
|
|
Extend Permit 180 days | 2/5/2019 | 2/5/2019 | 2/5/2019 | P | PASS |
Dan Ediger
|
|
|
wip
|
Plumbing Rough-in | 1/18/2019 | 1/18/2019 | 1/18/2019 | A | PASS |
Matt Wrobel
|
|
|
originally miss labeled
|
Final | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | CANC |
Matt Wrobel
|
|
|
Cesar Phone #: ###-#### miss labeled re assigned
|
Final | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | FAIL |
Dan Ediger
|
|
|
Cesar Phone #: ###-#### 1. Test water and dwv systems per code. 2. Install fittings and pipe configurations per ISPC. 3. Hang pipe per ISPC
|
PLM-Aging Inspection | 9/4/2018 | 9/4/2018 | 9/4/2018 | | NR |
Dan Ediger
|
|
|
Talked to permit holder, still working on the plumbing. Notified not to cover before rough in inspection.
|
Application received | | | 12/5/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/5/2017 | | DONE |
|
|
|
|