PLM-Aging Inspection | 10/11/2018 | 10/11/2018 | 10/11/2018 | | PASS |
Dan Ediger
|
|
|
|
Final | 10/11/2018 | 10/11/2018 | 10/11/2018 | A | PASS |
Dan Ediger
|
|
|
Was inspected under the plumbing permit
|
Plumbing Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | PASS |
Dan Ediger
|
|
|
Changed out Backflow to RP and is ready to inspect in mechanical room. Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy. The underfloor piping was never pressure tested, however has no joints and is not taking water.
|
Plumbing Rough-in | 1/3/2018 | 1/4/2018 | 1/4/2018 | P | PART |
Dan Ediger
|
|
|
Mechanical room heated floor system and gas pipe under pressure. Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy. Gas 20# ok. Add rp to hydronic system feed.
|
Issue PAID IN FULL permit | | | 1/3/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 1/3/2018 | | |
|
|
|
|
Application received | | | 1/3/2018 | | DONE |
|
|
|
This permit was created on the web by Soubanh Senethavialy
|
First Notice | 10/11/2018 | 10/11/2018 | | | |
Dan Ediger
|
|
|
|