Final | 4/17/2018 | 4/17/2018 | 4/17/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Plumbing Rough-in | 1/9/2018 | 1/10/2018 | 1/10/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Plumbing Rough-in | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PART |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon 1. the water softener drain must be 3/4 2. Add a 3" cleanout above the floor for the powder bath. 3. Add a cleanout to the back to back lavatories at the pool bath.
|
Issue PAID IN FULL permit | | | 1/8/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/8/2018 | | DONE |
|
|
|
This permit was created on the web by Raul Castanon
|