Water and/or Sewer | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | PASS |
Dan Ediger
|
|
|
Jason Phone #: ###-####
|
DOC - Permit Finaled | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | PASS |
Dan Ediger
|
|
|
|
Water and/or Sewer | 2/23/2018 | 2/23/2018 | 2/23/2018 | P | FAIL |
Dan Ediger
|
|
|
Jason Phone #: ###-####. 1. The water service may need to be 1-1/4. Check plans for total load. 2. Install a blue tracer wire. 3. Add an end of line cleanout at the upper terminal. 4. Remove the abs fitting from the pvc drain. 5. Put the system under test.
|
Application received | | | 2/20/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/20/2018 | | DONE |
|
|
|
|