Final | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Dan Ediger
|
|
|
#51238 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
Plumbing Rough-in | 4/12/2018 | 4/13/2018 | 4/13/2018 | P | PASS |
Dan Ediger
|
|
|
JOB # 51238 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
Plumbing Rough-in | 4/11/2018 | 4/12/2018 | 4/12/2018 | P | FAIL |
Dan Ediger
|
|
|
JOB # 51347 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes. 1. The waste and overflow is leaking on the tub/shower combo. 2 The 3" cleanout in the crawl must have 24" clearance. Install a wye and cleanout adapter or take above the floor.
|
Issue PAID IN FULL permit | | | 3/23/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Miscellaneous action | | | 3/23/2018 | | DONE |
|
|
|
Anne Marie called asked me to change an address on a permit. She pulled it for the wrong-changed parcel and address as well as changed the fee that was due because the house has less sq st then she orig thought
|
Application received | | | 3/20/2018 | | DONE |
|
|
|
This permit was created on the web by Ann Marie Reyes
|