Final | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Eric Strole
|
|
|
Call Jordan with questions ###-#### Inspection requested via web by Caleb Case
|
Final | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | CANC |
Eric Strole
|
|
|
Please call Jordan with ETA of Inspection Phone #: ###-#### Inspection requested via web by Caleb Case
|
Final | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Caleb Case-Temp final ok. Still need to address soap dispensor & will be replaceing w/h with tankless.
|
Final | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Caleb Case-Water heater requires a shut off valve. Need to run T&P. Need to install a thermal expantion tank. Need tempered water to public lav. Need open front seat on public toilet. Need to caulk all fixtures. Need to run seperate water line to soap dispensor at mop sink.
|
Plumbing Rough-in | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Caleb Case
|
Plumbing Rough-in | 5/29/2018 | 5/29/2018 | 5/29/2018 | P | PASS |
Eric Strole
|
|
|
Inspection requested via web by Caleb Case
|
Plumbing Rough-in | 4/12/2018 | 4/12/2018 | 4/12/2018 | P | PASS |
Eric Strole
|
|
|
Lock Box Code 640 Phone #: ###-#### Inspection requested via web by Caleb Case
|
Plumbing Rough-in | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | FAIL |
Eric Strole
|
|
|
Lock box for door entry 640. If you have questions please call Ron at Viking Plumbing ###-#### or Jordan Spivey ###-#### Phone #: ###-#### Inspection requested via web by Caleb Case-Need to approved plans on site.
|
Plumbing Rough-in | 4/10/2018 | 4/10/2018 | 4/10/2018 | P | NH |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Caleb Case-No access, left notice.
|
Plumbing Rough-in | 3/21/2018 | 3/22/2018 | 3/22/2018 | A | NR |
Eric Strole
|
|
|
Inspection requested via web by Caleb Case-They are going to resubmit plans.
|
Issue PAID IN FULL permit | | | 3/21/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 3/21/2018 | | |
|
|
|
|
Application received | | | 3/21/2018 | | DONE |
|
|
|
This permit was created on the web by Caleb Case
|
First Notice | 7/31/2018 | 7/31/2018 | | | |
Eric Strole
|
|
|
|