Storm Drains | 1/7/2019 | 1/7/2019 | 1/7/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by JD Borges
|
DOC - Permit Finaled | 1/7/2019 | 1/7/2019 | 1/7/2019 | P | PASS |
Eric Strole
|
|
|
|
Storm Drains | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by JD Borges-Sections of storm drains tested pass.
|
Storm Drains | 1/3/2019 | 1/3/2019 | 1/3/2019 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by JD Borges Inspection cancelled from web by: JD Borges
|
Storm Drains | 11/29/2018 | 11/29/2018 | 11/29/2018 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by JD Borges-North side wing 1 ok to cover, Test on south side wing 1 test pass.
|
Storm Drains | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by JD Borges-Need to fix flat section of storm drain.
|
Water and/or Sewer | 10/24/2018 | 10/25/2018 | 10/25/2018 | A | PART |
Eric Strole
|
|
|
Grease interceptor Phone #: ###-#### Inspection requested via web by JD Borges-Vent & baffles pass.
|
Storm Drains | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by JD Borges-Section of storm drain ok to cover. North side of building left. All piping still needs tested.
|
Storm Drains | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | CANC |
Eric Strole
|
|
|
Please come ASAP it is ready right now Phone #: ###-#### Inspection requested via web by JD Borges-Nothing to look at.
|
Water and/or Sewer | 9/11/2018 | 9/12/2018 | 9/12/2018 | P | PART |
Eric Strole
|
|
|
Interceptor inspection Phone #: ###-#### Inspection requested via web by JD Borges-Test on interceptor pass.
|
Water and/or Sewer | 9/10/2018 | 9/11/2018 | 9/11/2018 | P | PART |
Eric Strole
|
|
|
Interceptor inspection Phone #: ###-#### Inspection requested via web by JD Borges-Start of 24 hr test on interceptor.
|
Storm Drains | 9/4/2018 | 9/5/2018 | 9/5/2018 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by JD Borges-Section complete is marked on plans. All still needs tested.
|
Storm Drains | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PART |
Eric Strole
|
|
|
Come and inspect WYE as early as possible. Thank you. Phone #: ###-#### Inspection requested via web by JD Borges-Last correction to replace tee with directional fitting has been fixed.
|
Storm Drains | 8/20/2018 | 8/21/2018 | 8/21/2018 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by JD Borges-Section complete ok to cover. All still needs tested.
|
Roof Drains | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by JD Borges-Need to use directional fittings on section inspected.
|
Water and/or Sewer | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by JD Borges-Waterline pass.
|
Water and/or Sewer | 6/28/2018 | 6/28/2018 | 6/28/2018 | P | CANC |
Eric Strole
|
|
|
Waiting on suez to turn meter on. Phone #: ###-#### >> Inspection requested via web by JD Borges Inspection cancelled from web by: JD Borges
|
Water and/or Sewer | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by JD Borges Inspection cancelled from web by: JD Borges
|
Water and/or Sewer | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PART |
Eric Strole
|
|
|
Please come after 830am.
Thank you!!!!! Phone #: ###-#### Inspection requested via web by JD Borges-Sewer east side pass.
|
Water and/or Sewer | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by JD Borges-Not ready
|
Water and/or Sewer | 6/19/2018 | 6/20/2018 | 6/20/2018 | P | CANC |
Eric Strole
|
|
|
Might need to stop by in the late AM to check on the progress of fitting that is underneath water and then come back to finalize inspection in the afternoon Phone #: ###-#### Inspection requested via web by JD Borges
|
Water and/or Sewer | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by JD Borges-6" sewer norh end pass.
|
Water and/or Sewer | 5/6/2018 | 5/7/2018 | 5/7/2018 | A | CANC |
Eric Strole
|
|
|
Please come before 730am on Monday May 7th Phone #: ###-#### Inspection requested via web by JD Borges-Nothing to look at.
|
Water and/or Sewer | 3/29/2018 | 3/29/2018 | 3/29/2018 | A | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by JD Borges-Not ready
|
Water and/or Sewer | 3/28/2018 | 3/29/2018 | 3/29/2018 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by JD Borges-Water in produce prep, bakery exteriour & interiour pass.
|
Issue PAID IN FULL permit | | | 3/28/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/28/2018 | | DONE |
|
|
|
This permit was created on the web by JD Borges
|
First Notice | 1/7/2019 | 1/7/2019 | | | |
Eric Strole
|
|
|
|