Sprinkler (Final) | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Nicole Edgar
|
Sprinkler (Final) | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Nicole Edgar-Barbed connections require 2 hose clamps. Need to grade line from PVB down to drain down valve.
|
Sprinkler (Final) | 6/1/2018 | 6/5/2018 | 6/5/2018 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Nicole Edgar-Need to use approved material up to backflow.
|
Issue PAID IN FULL permit | | | 4/13/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/13/2018 | | DONE |
|
|
|
This permit was created on the web by Nicole Edgar
|