Final | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | PASS |
Eric Strole
|
|
|
Two restrooms. Access through main East Hollignshead doors and call me or inquires front desk. Phone #: ###-#### Inspection requested via web by Ben Taylor
|
Plumbing Rough-in | 8/29/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Eric Strole
|
|
|
Restrooms, access via north east outside door by portapotty Phone #: ###-#### Inspection requested via web by Ben Taylor
|
Groundwork | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | PASS |
Eric Strole
|
|
|
Phase 2 underground for moved restroom and added restroom. Access via East door by portapotty. Phone #: ###-#### Inspection requested via web by Ben Taylor
|
Final | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PART |
Eric Strole
|
|
|
Partial final ready again Phone #: ###-#### Inspection requested via web by Ben Taylor-Phase 1 pass, temp final ok.
|
Final | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | FAIL |
Eric Strole
|
|
|
Final for phase 1. So a partial final on the total permit. Includes break room and wash room sinks. Phone #: ###-#### Inspection requested via web by Ben Taylor-Need to add gate valves on lift stations under sinks.
|
Plumbing Rough-in | 5/30/2018 | 5/31/2018 | 5/31/2018 | P | PASS |
Eric Strole
|
|
|
Partial plumbing rough in for phase 1. Access through side west door propped open for construction. Phone #: ###-#### Inspection requested via web by Ben Taylor
|
Issue PAID IN FULL permit | | | 5/21/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 5/21/2018 | | |
|
|
|
|
Application received | | | 5/21/2018 | | DONE |
|
|
|
This permit was created on the web by Ben Taylor
|
First Notice | 10/30/2018 | 10/30/2018 | | | |
Eric Strole
|
|
|
|