Final | 8/16/2018 | 8/17/2018 | 8/17/2018 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Greg Berman
|
Plumbing Rough-in | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Bill VanDegrift
|
|
|
ri ok
|
Plumbing Rough-in | 6/6/2018 | 6/7/2018 | 6/7/2018 | A | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Greg Berman 1) toilet and tub vent must be 6" above the tub rim before connecting. 2) santee at tub/toilet is upside down 3) ok to cover the floors
|
Plumbing Rough-in | 6/5/2018 | 6/6/2018 | 6/6/2018 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Greg Berman Inspection cancelled from web by: Greg Berman
|
Issue PAID IN FULL permit | | | 5/30/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 5/30/2018 | | DONE |
|
|
|
This permit was created on the web by Greg Berman
|