Storm Drains | 7/24/2018 | 7/25/2018 | 7/25/2018 | A | PASS |
Dan Ediger
|
|
|
Alfredo Phone #: ###-####
|
DOC - Permit Finaled | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
Dan Ediger
|
|
|
24 hr test complete. storm drain and sewer test complete
|
Water and/or Sewer | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PART |
Bill VanDegrift
|
|
|
test on the rain drain heading west out of the shop ok, sewer test from interceptor to tie in ok, start 24 hour interceptor test, as it sits the water level is about 1 inch below outlet in tank, tank needs the dip tubes installed.
|
Water and/or Sewer | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | NR |
Dan Ediger
|
|
|
Alfredo Phone #: ###-#### sewer test failed
|
Water and/or Sewer | 7/16/2018 | 7/17/2018 | 7/17/2018 | P | PART |
Dan Ediger
|
|
|
Alfredo Phone #: ###-####. Went over the requirments for the roof drains and Flammable/oil interceptor and test.
|
Issue PAID IN FULL permit | | | 6/4/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/4/2018 | | DONE |
|
|
|
This permit was created on the web by Taylor Landa
|
First Notice | 7/25/2018 | 7/25/2018 | | | |
Dan Ediger
|
|
|
|