Pressure Test | 7/27/2018 | 7/27/2018 | 7/27/2018 | P | PASS |
Dan Ediger
|
|
|
Alex Phone #: ###-####
|
DOC - Permit Finaled | 7/27/2018 | 7/27/2018 | 7/27/2018 | P | PASS |
Dan Ediger
|
|
|
|
Water and/or Sewer | 7/24/2018 | 7/25/2018 | 7/25/2018 | A | PART |
Dan Ediger
|
|
|
Alex Phone #: ###-####. Ok to caver all but the joints. A prrssure test is required befire the joints are covered. run the tracer wire continuous to each unit.
|
Water and/or Sewer | 7/23/2018 | 7/24/2018 | 7/24/2018 | P | FAIL |
Dan Ediger
|
|
|
Alex-water only Phone #: ###-####. 1. Sleeve the water lines 10 feet each side of the sewer lines. 2. Install a blue 18ga tracer wire on each lline. 3. Pressure test lines.
|
Application received | | | 7/19/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/19/2018 | | DONE |
|
|
|
|