Print Statement | | | 7/22/2019 | | DONE |
|
|
|
|
Final | 2/19/2019 | 2/20/2019 | 2/20/2019 | A | PASS |
Eric Strole
|
|
|
|
Final | 2/18/2019 | 2/19/2019 | 2/19/2019 | A | PART |
Eric Strole
|
|
|
please call Kinley 30 before showing up Phone #: ###-#### Inspection requested via web by Brian Johansen-Need to run seperate water supply to soap dispensor at mop sink.
|
Final | 1/30/2019 | 1/31/2019 | 1/31/2019 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Temp final ok.
|
Final | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-No TCO till approved by the city.
|
Plumbing Rough-in | 1/16/2019 | 1/17/2019 | 1/17/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Floor sink for pedicure chair pass.
|
Other | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | DONE |
Eric Strole
|
|
|
Conf. With Eric and Kinley Phone #: ###-#### Inspection requested via web by Brian Johansen-Conferance on backflows required on pedicure. Need to install rpba's.
|
Plumbing Rough-in | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 11/8/2018 | 11/9/2018 | 11/9/2018 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Rough-in complete except tie-in of lift station.
|
Water and/or Sewer | 11/8/2018 | 11/9/2018 | 11/9/2018 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 11/7/2018 | 11/7/2018 | 11/7/2018 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-All rough-in good except the 2 3" cpvc tees in overhead in common area.
|
Plumbing Rough-in | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Test on water fail & 1 1/2" horizontal vent can not exceed 20 feet.
|
Storm Drains | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Roof drains for canopy pass.
|
Plumbing Rough-in | 11/2/2018 | 11/5/2018 | 11/5/2018 | A | PART |
Eric Strole
|
|
|
and gas test Phone #: ###-#### Inspection requested via web by Brian Johansen-60 lb gas test pass. This completes gas pipe rough-in. Can only use like material with cpvc female adaptors.
|
Plumbing Rough-in | 10/24/2018 | 10/25/2018 | 10/25/2018 | A | PART |
Eric Strole
|
|
|
lift station Phone #: ###-#### Inspection requested via web by Brian Johansen-Vent pass.
|
Pressure Test | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | PART |
Eric Strole
|
|
|
gas and condensate inspection Phone #: ###-#### Inspection requested via web by Brian Johansen 60 # gas test, both corridors only to pass
|
Plumbing Rough-in | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | FAIL |
Eric Strole
|
|
|
gas and condensate inspection Phone #: ###-#### Inspection requested via web by Brian Johansen-!st gauge will not zero out & 2nd gas test fail.
|
Plumbing Rough-in | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | PART |
Eric Strole
|
|
|
Building B please Phone #: ###-#### Inspection requested via web by Brian Johansen-MC prep & area A rooms pass.
|
Plumbing Rough-in | 10/18/2018 | 10/18/2018 | 10/18/2018 | P | PART |
Eric Strole
|
|
|
Building B please Phone #: ###-#### Inspection requested via web by Brian Johansen-Need to get water up on test and finish securing hot water in overhead.
|
Plumbing Rough-in | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | FAIL |
Eric Strole
|
|
|
building B please Phone #: ###-#### Inspection requested via web by Brian Johansen-Missing nailplates, water test fail, all overhead hot waterlines need secured.
|
Plumbing Rough-in | 10/17/2018 | 10/17/2018 | 10/17/2018 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Need to fix reverse grade on vents and missing nailplates& fix leak on vent.
|
Plumbing Rough-in | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Groundwork | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Section of pressure sewer ok to cover as long as it is per lift station specs.
|
Issue PAID IN FULL permit | | | 8/24/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/16/2018 | | |
|
|
|
|
First Notice | 2/20/2019 | 2/20/2019 | | | |
Eric Strole
|
|
|
|