Final | 12/24/2018 | 12/26/2018 | 12/26/2018 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith-Final was passed last Friday by Matt.
|
Final | 12/24/2018 | 12/24/2018 | 12/24/2018 | P | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith leaks appear to have been fixed
|
Final | 12/20/2018 | 12/21/2018 | 12/21/2018 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith-Still have leaks.
|
Final | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | FAIL |
Eric Strole
|
|
|
natalie Phone #: ###-####-Several leaks under sinks, No hot water turned in, Need to loop dishwasher drain up as high as possible under cabinet.
|
Fees Due Hold | 9/12/2018 | | 10/30/2018 | | DONE |
|
|
|
|
Plumbing Rough-in | 9/11/2018 | 9/12/2018 | 9/12/2018 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith-Test on water heater flue pass.
|
Plumbing Rough-in | 9/11/2018 | 9/11/2018 | 9/11/2018 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith-Test on water heater flue fail.
|
Plumbing Rough-in | 9/7/2018 | 9/10/2018 | 9/10/2018 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith-Water heater flue not complete or on test.
|
Plumbing Rough-in | 9/6/2018 | 9/7/2018 | 9/7/2018 | P | FAIL |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith dwv and water test failed
|
Plumbing Rough-in | 9/5/2018 | 9/6/2018 | 9/6/2018 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith-Corrections still not complete. (Reinspection fee issued.)
|
Plumbing Rough-in | 9/4/2018 | 9/5/2018 | 9/5/2018 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kevin Smith
|
Plumbing Rough-in | 8/31/2018 | 9/4/2018 | 9/4/2018 | P | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith
|
Plumbing Rough-in | 8/30/2018 | 8/31/2018 | 8/31/2018 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kevin Smith
|
Plumbing Rough-in | 8/29/2018 | 8/30/2018 | 8/30/2018 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith-Base of stack cleanouts are required to be above the floor. Vent for upstairs shower needs to be downstream of trap. DWV and water test fail.
|
Plumbing Rough-in | 8/28/2018 | 8/29/2018 | 8/29/2018 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kevin Smith
|
Issue PAID IN FULL permit | | | 8/22/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/22/2018 | | DONE |
|
|
|
This permit was created on the web by Kevin Smith
|