Sprinkler (Final) | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PASS |
Dan Ediger
|
|
|
Stan Phone #: ###-####
|
Sprinkler (Final) | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | FAIL |
Dan Ediger
|
|
|
Stan Phone #: ###-#### the pvb must be 12" above the highest outlet. raise 16" with metal pipe
|
Sprinkler (Final) | 9/14/2018 | 9/14/2018 | 9/14/2018 | P | FAIL |
Dan Ediger
|
|
|
Stan Phone #: ###-####. Double check valves are not approved for sprinkler systems as of Jan 2018. Install a rp or pvb. Hard pipe above grade
|
Application received | | | 9/13/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/13/2018 | | DONE |
|
|
|
|