Final | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | PASS |
Eric Strole
|
|
|
|
Water and/or Sewer | 11/7/2018 | 11/8/2018 | 11/8/2018 | A | PASS |
Eric Strole
|
|
|
Wiley-sewer only Phone #: ###-####-Test on pressure sewer pass.
|
Water and/or Sewer | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | PART |
Eric Strole
|
|
|
Waterline-Ok to cover, still need connection at building and meter and needs tested.
|
Water and/or Sewer | 9/27/2018 | 9/28/2018 | 9/28/2018 | A | PART |
Eric Strole
|
|
|
Waterline-Middle connection ok to cover.
|
Water and/or Sewer | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | PART |
Eric Strole
|
|
|
Waterline-OK to cover except connections.
|
Water and/or Sewer | 9/26/2018 | 9/27/2018 | 9/27/2018 | A | PART |
Eric Strole
|
|
|
installation of pressure sewer discharge pipe. Riley Caldwell primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Ok to cover pressure sewer. Still need lift station and tie-in at sewer.
|
Water and/or Sewer | 9/21/2018 | 9/24/2018 | 9/24/2018 | A | PASS |
Eric Strole
|
|
|
Inspection of Sand and Oil separator installation and water test. Riley Caldwell primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Test on interceptor pass.
|
Water and/or Sewer | 9/20/2018 | 9/21/2018 | 9/21/2018 | P | PART |
Eric Strole
|
|
|
Inspection of Sand and Oil separator installation and water test. Riley Caldwell primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Start of 24 hr test on interceptor
|
Issue PAID IN FULL permit | | | 9/19/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/19/2018 | | DONE |
|
|
|
This permit was created on the web by Craig Fischer
|
First Notice | 4/8/2019 | 4/8/2019 | | | |
Eric Strole
|
|
|
|