Water Heater Final | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | PASS |
Eric Strole
|
|
|
please call Jef prior to arrival ###-#### Phone #: ###-#### Inspection requested via web by Andrea Grigsby
|
Pressure Test | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Andrea Grigsby-60 lb gas test pass.
|
Pressure Test | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Andrea Grigsby-Is going to fix gas piping and recall for inspection.
|
Pressure Test | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Andrea Grigsby-Changed to PM.
|
Issue PAID IN FULL permit | | | 10/2/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/2/2018 | | DONE |
|
|
|
This permit was created on the web by Andrea Grigsby
|