Final | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Nick Marsala
|
Plumbing Rough-in | 10/19/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
Dan Ediger
|
|
|
Call nick for key code Phone #: ###-#### Inspection requested via web by Nick Marsala
|
Groundwork | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | FAIL |
Dan Ediger
|
|
|
call nick for access code for key lock to get into the house. Phone #: ###-#### Inspection requested via web by Nick Marsala 1. The 3" drain is flat. Provide a 1/4"/ft grade. 2. Install a 3" cleanout above the floor or within 5 feet of the crawl. 3. The cast iron to plastic transition must be done with an approved shielded band
|
Fees Due Hold | 10/6/2018 | | 10/17/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/5/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/5/2018 | | DONE |
|
|
|
This permit was created on the web by Nick Marsala
|
Issue permit | | | 3/20/2000 | | DONE |
|
|
|
|