Final | 11/8/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
Final | 11/7/2018 | 11/8/2018 | 11/8/2018 | P | NR |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette water heater needs installed dont forget drip leg at appliance
|
Pressure Test | 11/7/2018 | 11/8/2018 | 11/8/2018 | P | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette 20# test o.k.
|
Pressure Test | 10/29/2018 | 10/30/2018 | 10/30/2018 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette pressure test failed. At zero
|
Final | 10/29/2018 | 10/30/2018 | 10/30/2018 | P | PART |
Dan Ediger
|
|
|
I scheduled this in case you can do the final at the same time as the gas pressure inspection. Phone #: ###-#### Inspection requested via web by Mary LaFayette water softener ok
|
Issue PAID IN FULL permit | | | 10/18/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/18/2018 | | DONE |
|
|
|
This permit was created on the web by Mary LaFayette
|