Final | 12/10/2018 | 12/11/2018 | 12/11/2018 | A | PASS |
Eric Strole
|
|
|
Joe Phone #: ###-####
|
Final | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | FAIL |
Eric Strole
|
|
|
T&P requires an airgap above hyb drain and need to caulk toilet.
|
Water and/or Sewer | 12/10/2018 | 12/10/2018 | 12/10/2018 | P | CANC |
Eric Strole
|
|
|
Call 15 mins ahead- Joe Phone #: ###-####
|
Plumbing Rough-in | 11/14/2018 | 11/14/2018 | 11/14/2018 | P | PASS |
Matt Wrobel
|
|
|
Gill-homeowner Phone #: ###-####
|
Plumbing Rough-in | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | NH |
Eric Strole
|
|
|
Casey Phone #: ###-####-No access, left notice.
|
Plumbing Rough-in | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PART |
Eric Strole
|
|
|
casey Phone #: ###-####-DWV pass.
|
Groundwork | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | PASS |
Eric Strole
|
|
|
KC Phone #: ###-####
|
Water and/or Sewer | 10/19/2018 | 10/19/2018 | 10/19/2018 | P | PASS |
Eric Strole
|
|
|
Casey Phone #: ###-####-sewer pass.
|
Application received | | | 10/19/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/19/2018 | | DONE |
|
|
|
|