Sprinkler (Final) | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PASS |
Eric Strole
|
|
|
Backflow Inspection Phone #: ###-#### Inspection requested via web by Nick Louie
|
Other | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | FAIL |
Eric Strole
|
|
|
Backflow Inspection Phone #: ###-#### Inspection requested via web by Nick Louie-Waterline needs to grade from pvb back to draindown valve.
|
Other | 10/24/2018 | 10/25/2018 | 10/25/2018 | A | FAIL |
Eric Strole
|
|
|
Backflow Inspection Phone #: ###-#### Inspection requested via web by Nick Louie-Need to uncover for inspection & pvb needs tested.
|
Issue PAID IN FULL permit | | | 10/24/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/24/2018 | | DONE |
|
|
|
This permit was created on the web by Nick Louie
|