Final | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | PASS |
Daryl Spivey
|
|
|
Should be open if not give me or gary a call thanks Phone #: ###-#### Inspection requested via web by Frank Young
|
Plumbing Rough-in | 1/11/2019 | 1/11/2019 | 1/11/2019 | A | PASS |
Eric Strole
|
|
|
Frank Young
|
Plumbing Rough-in | 1/3/2019 | 1/4/2019 | 1/4/2019 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Frank Young-Need to meet cross sectional venting & base of stack cleanouts are required to be above the floor.
|
Issue PAID IN FULL permit | | | 11/1/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/1/2018 | | DONE |
|
|
|
This permit was created on the web by Frank Young
|