Final | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith
|
Final | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith-T&P requires an air-gap above the floor drain.
|
Plumbing Rough-in | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith
|
Issue PAID IN FULL permit | | | 11/15/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/15/2018 | | DONE |
|
|
|
This permit was created on the web by Kevin Smith
|