Final | 12/4/2018 | 12/5/2018 | 12/5/2018 | A | PASS |
Eric Strole
|
|
|
Please call Brian with any questions. Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
|
Final | 11/27/2018 | 11/28/2018 | 11/28/2018 | P | PART |
Eric Strole
|
|
|
Please call Brian, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Section tested pass.
|
Pressure Test | 11/16/2018 | 11/19/2018 | 11/19/2018 | A | PART |
Dan Ediger
|
|
|
Please call Brian Smith to arrange a place to meet to walk and view the head test on this system Phone #: ###-#### Inspection requested via web by Xenon Long. pressure test overhead to tanks
|
Issue PAID IN FULL permit | | | 11/16/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/16/2018 | | DONE |
|
|
|
This permit was created on the web by Xenon Long
|
First Notice | 12/5/2018 | 12/5/2018 | | | |
Eric Strole
|
|
|
|