Water Heater Final | 1/10/2019 | 1/15/2019 | 1/15/2019 | P | PASS |
Eric Strole
|
|
|
Please call when you are on your way. I scheduled a gas line pressure test for today as well. Thank you. Phone #: ###-#### Inspection requested via web by McKenna Haycock
|
Pressure Test | 1/10/2019 | 1/15/2019 | 1/15/2019 | P | PASS |
Eric Strole
|
|
|
Please call when you are on your way. I will be scheduling a 2nd inspection for today at the same time for the water heater Phone #: ###-#### Inspection requested via web by McKenna Haycock-20 lb gas test pass
|
Pressure Test | 12/12/2018 | 12/14/2018 | 12/14/2018 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by McKenna Haycock Inspection cancelled from web by: McKenna Haycock
|
Final | 11/30/2018 | 12/6/2018 | 12/6/2018 | P | CANC |
Eric Strole
|
|
|
Please call before you go over for the inspection. Thank you. Phone #: ###-#### >> Inspection requested via web by McKenna Haycock Inspection cancelled from web by: McKenna Haycock
|
Pressure Test | 11/30/2018 | 12/6/2018 | 12/6/2018 | P | CANC |
Eric Strole
|
|
|
Please call before you go over for the inspection. Thank you. Phone #: ###-#### >> Inspection requested via web by McKenna Haycock Inspection cancelled from web by: McKenna Haycock
|
Issue PAID IN FULL permit | | | 11/30/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/30/2018 | | DONE |
|
|
|
This permit was created on the web by McKenna Haycock
|