Final | 1/31/2020 | 2/3/2020 | 2/3/2020 | A | PASS |
Eric Strole
|
|
|
Final for Area B. Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Card not on site to sign | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Eric Strole
|
|
|
Final for Area B. Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Final | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PART |
Eric Strole
|
|
|
Building B-Domes on roof drains missing, ada unit dishwasher hose needs strapped up under sink.
|
Final | 1/31/2020 | 2/3/2020 | 1/31/2020 | P | CANC |
Eric Strole
|
|
|
Contact: Robert Church ###-#### - Final for Area B Phone #: ###-#### >> Inspection requested via web by Brent Lacy Inspection cancelled from web by: Brent Lacy
|
Final | 1/31/2020 | 1/31/2020 | 1/31/2020 | A | NR |
Eric Strole
|
|
|
Area B is not approved for TCO at this time.
|
Final | 1/28/2020 | 1/28/2020 | 1/28/2020 | P | NR |
Matt Wrobel
|
|
|
Final for Area B - Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy units#101,102,107,202,206,201,207,301 passunit #208 p[ass
|
Final | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PART |
Matt Wrobel
|
|
|
Final for Area B. Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy units#303, 304 pass units#101,102,107,202,206,201,207,301 fail dw loop must be raised to top of counter underside and drop into disposal connection. unit #208 fail needs a right hand lever tank for ada requirements
|
Final | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | PART |
Eric Strole
|
|
|
Final for Area A - Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy-Bld #1 Units 103, 104, 105, 106, 203, 204, 206, 302 pass. Temp final ok.
|
Final | 1/14/2020 | 1/15/2020 | 1/15/2020 | A | PART |
Eric Strole
|
|
|
Final - Area A. Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy-Units 302, 205, 106 pass. Units 204, 203, 104, 105, 103 fail- Require an approved air-gap above floor drain.
|
Final | 1/14/2020 | 1/14/2020 | 1/14/2020 | P | FAIL |
Eric Strole
|
|
|
Contact: Robert Church ###-####. Final for Area A. Phone #: ###-#### Inspection requested via web by Brent Lacy-T&P's require an air-gap.
|
Final | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | FAIL |
Eric Strole
|
|
|
Contact: Robert Church ###-####. Final inspection for area A. Phone #: ###-#### Inspection requested via web by Brent Lacy-T&P's require an air-gap above floor drains. Need to caulk all fixtures. Need to label unit numbers on all units. Need access to all units.
|
Final | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | NR |
Eric Strole
|
|
|
Final for Area A, Unit 302. Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy-Need to uncover all fixtures for inspection.
|
Plumbing Rough-in | 10/4/2019 | 10/7/2019 | 10/7/2019 | A | PASS |
Eric Strole
|
|
|
Contact: Robert ###-####. This is for the entire water rough in for whole building, first, second, and third floor. Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Plumbing Rough-in | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | NH |
Dan Ediger
|
|
|
Contact: Robert Church ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy no answer and no details left on the notes as to what I'm supposed to be inspecting. could not find anyone on the job. reschedule
|
Plumbing Rough-in | 9/23/2019 | 9/24/2019 | 9/24/2019 | A | PART |
Matt Wrobel
|
|
|
Robert Church - Contact Phone #: ###-#### Inspection requested via web by Brent Lacy 1st floor south end water ok to coverf
|
Plumbing Rough-in | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PART |
Eric Strole
|
|
|
Contact: Robert Church ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy-1st floor units pass.
|
Plumbing Rough-in | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | PART |
Eric Strole
|
|
|
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy-Need to fox leak on dwv in basement.
|
Plumbing Rough-in | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | FAIL |
Eric Strole
|
|
|
Contact: Robert Church ###-#### Building B - 1st Floor. Phone #: ###-#### Inspection requested via web by Brent Lacy-Test on water 1st flr pass. Need to fix horizontal wet vent in basement and get dwv to hold test.
|
Plumbing Rough-in | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | PART |
Eric Strole
|
|
|
Contact: Craig Lacy ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy-Area B dwv & water in units 2nd flr pass.
|
Plumbing Rough-in | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | FAIL |
Eric Strole
|
|
|
Contact: Craig Lacy ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy-Missing nailplates.
|
Plumbing Rough-in | 7/11/2019 | 7/12/2019 | 7/12/2019 | P | PART |
Eric Strole
|
|
|
Contact: Craig Lacy ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy-Area-B dwv & roof drains 2nd & 3rd flr & water 3rd flr test pass.
|
Plumbing Rough-in | 7/10/2019 | 7/11/2019 | 7/11/2019 | P | NR |
Eric Strole
|
|
|
Contact: Craig Lacy ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy-Not ready.
|
Plumbing Rough-in | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | NR |
Eric Strole
|
|
|
Contact: Craig Lacy ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy-Not ready.
|
Other | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | DONE |
Eric Strole
|
|
|
This is for a consultation regarding water rough in. Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy-Conferance on water.
|
Plumbing Rough-in | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | PART |
Eric Strole
|
|
|
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy-Ok to cover the 2 secondary's.
|
Roof Drains | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | PART |
Eric Strole
|
|
|
Contact: Robert Church ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy-Need to replace 2 secondary roof drains with approved roof drains. OK to cover this area except under those 2 roof drains.
|
Roof Drains | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | FAIL |
Eric Strole
|
|
|
Contact: Robert Church ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy-Need to test roof drains.
|
Other | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PART |
Eric Strole
|
|
|
Conferance-Conferance on roof drains.
|
Roof Drains | 4/23/2019 | 4/23/2019 | 4/24/2019 | P | PART |
Eric Strole
|
|
|
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy-Roof drains tested in building A pass. Need to install secondary roof drains in unit 302 being deck drains are also roof drains.
|
Plumbing Rough-in | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PART |
Eric Strole
|
|
|
Contact: Robert Church ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy-Building A DWV & water pass, Still need water mains run & tested & roof drains tested.
|
Plumbing Rough-in | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | CANC |
Eric Strole
|
|
|
Contact: Robert Church Phone #: ###-#### >> Inspection requested via web by Brent Lacy Inspection cancelled from web by: Brent Lacy
|
Plumbing Rough-in | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | NR |
Eric Strole
|
|
|
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy
|
Other | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | DONE |
Eric Strole
|
|
|
Contact: Robert Church ###-####. Consultation regarding clean outs on DWV. Phone #: ###-#### Inspection requested via web by Brent Lacy-Went over c/o requirements and horizontal wet venting that needs to be plumbed per the 2017 ISPC.
|
Groundwork | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | PART |
Eric Strole
|
|
|
Contact: Robert Church ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy-Test on 2 sewer & 1 roof drain south east corner pass.
|
Groundwork | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PART |
Eric Strole
|
|
|
Contact: Robert Church ###-####. We forgot to reschedule this inspection for this morning on Friday. We would really appreciate getting an inspection as soon as possible, if possible. Sorry for the inconvenience! Thank you! Phone #: ###-#### Inspection requested via web by Brent Lacy-Stub in & out of sewer & roof drains pass.
|
Groundwork | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | FAIL |
Eric Strole
|
|
|
Stub out 5'' from basement wall. Phone #: ###-#### Inspection requested via web by Brent Lacy-No approved plans on site.
|
Groundwork | 12/21/2018 | 12/26/2018 | 12/26/2018 | A | PEND |
Eric Strole
|
|
|
Contact: Robert Church Phone #: ###-#### Inspection requested via web by Brent Lacy-Waiting on building permit to be issued.
|
Issue PAID IN FULL permit | | | 12/21/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/21/2018 | | DONE |
|
|
|
This permit was created on the web by Brent Lacy
|