Water Heater Final | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Dan Ediger
|
|
|
received picture
|
Water Heater Final | 1/10/2019 | 1/11/2019 | 1/11/2019 | A | FAIL |
Dan Ediger
|
|
|
Art is the home owner. ###-#### I talked to Dan about the t;p holes through garage he was ok with it since hole was there. Phone #: ###-#### Inspection requested via web by Mark Kelso NEC REQUIRES A BREAKER LOCKOUT OR DISCONNECT AT THE ELECTRIC WATER HEATER. WENT OVER DETAILS WITH THE HOMEOWNER. HE WILL CALL AN ELECTRICIAN
|
Issue PAID IN FULL permit | | | 1/10/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/10/2019 | | DONE |
|
|
|
This permit was created on the web by Mark Kelso
|