Sprinkler (Final) | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Eric Strole
|
|
|
Johnny (husband) Phone #: ###-####
|
Sprinkler (Final) | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PART |
Matt Wrobel
|
|
|
Johnie Phone #: ###-#### ok to cover need pvb certified
|
Sprinkler (Final) | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | FAIL |
Dan Ediger
|
|
|
Johnny (husband to Teresa)-please call 15 minutes prior to meet Phone #: ###-#### Gates valves are not approved for bury. Install sprinkler or curb stop valves.
|
Water and/or Sewer | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PART |
Eric Strole
|
|
|
Johnie Phone #: ###-####-Waterline pass, will install a pvb later & add to permit. OK to cover except where main & drain & backflow is going.
|
Water and/or Sewer | 3/25/2019 | 3/26/2019 | 3/26/2019 | A | FAIL |
Eric Strole
|
|
|
Johnie Phone #: ###-####-Cannot use sprinkler clamps & need to run a tracer wire.
|
Application received | | | 3/22/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/22/2019 | | DONE |
|
|
|
|