First Notice | 4/8/2019 | 4/8/2019 | 4/22/2019 | | DONE |
Eric Strole
|
|
|
This permit finaled on the web by Samuel Drake
|
Final | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | PASS |
Eric Strole
|
|
|
Backflow tested. Should be all good. Phone #: ###-#### Inspection requested via web by Samuel Drake
|
Final | 4/3/2019 | 4/3/2019 | 4/3/2019 | P | PART |
Eric Strole
|
|
|
Enter Through East Side of Building at Briggs Engineering. Water Heater is at First Left Closet Down the Hall. Phone #: ###-#### Inspection requested via web by Samuel Drake-Water heater pass. DBCA needs tested.
|
Issue PAID IN FULL permit | | | 4/3/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/3/2019 | | DONE |
|
|
|
This permit was created on the web by Samuel Drake
|