Final | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Samuel Drake
|
Plumbing Rough-in | 8/7/2019 | 8/8/2019 | 8/8/2019 | P | PASS |
Matt Wrobel
|
|
|
Remember... your map is lying. This is south mitchell between maple grove and five mile on victory. Phone #: ###-#### Inspection requested via web by Samuel Drake
|
Groundwork | 6/2/2019 | 6/3/2019 | 6/3/2019 | A | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Samuel Drake
|
Other | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | DONE |
Matt Wrobel
|
|
|
Consult - Need help laying out proper design for this installation. Please call 20 minutes ahead of time so that I can meet you there. Phone #: ###-#### Inspection requested via web by Samuel Drake
|
Issue PAID IN FULL permit | | | 4/22/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/22/2019 | | DONE |
|
|
|
This permit was created on the web by Samuel Drake
|