Final | 5/3/2019 | 5/6/2019 | 5/6/2019 | P | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Andrea Grigsby
|
Water Heater Final | 5/3/2019 | 5/3/2019 | 5/3/2019 | P | CANC |
Matt Wrobel
|
|
|
Phone #: ###-#### >> Inspection requested via web by Andrea Grigsby Inspection cancelled from web by: Andrea Grigsby
|
Water Heater Final | 4/28/2019 | 4/29/2019 | 4/29/2019 | P | FAIL |
Matt Wrobel
|
|
|
Karen Cranney will not be available until after 1pm. Phone #: ###-#### Inspection requested via web by Andrea Grigsby 1.water heater vent needs to be sized correctly 2. re rout water heater vent to insure appropriate clearences. 3. need a water alarm on floor since there is no floor drain
|
Issue PAID IN FULL permit | | | 4/26/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/26/2019 | | DONE |
|
|
|
This permit was created on the web by Andrea Grigsby
|