Final | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | PASS |
Eric Strole
|
|
|
Robert Phone #: ###-####
|
Final | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | CANC |
Eric Strole
|
|
|
Bobby Phone #: ###-####
|
Final | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PART |
Eric Strole
|
|
|
Robert Phone #: ###-####-Ok to cover, RPBA is installed backwards and blow out valve is on wrong side and RPBA needs tested.
|
Other | 5/29/2019 | 5/30/2019 | 5/30/2019 | P | PART |
Eric Strole
|
|
|
conference- Robert Phone #: ###-####-Conferance on waterline.
|
Application received | | | 5/29/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/29/2019 | | DONE |
|
|
|
|