Final | 1/22/2020 | 1/22/2020 | 1/22/2020 | P | PASS |
Eric Strole
|
|
|
call for access at least 45 mins prior Randy Phone #: ###-####
|
Plumbing Rough-in | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | PASS |
Daryl Spivey
|
|
|
Randy- please call before inspection, and notify if it passes Phone #: ###-####
|
Override - Parcel Holds | 10/17/2019 | 1/1/1900 | 10/17/2019 | | |
|
|
|
this inspection is for the plumbing and the stop work order applies to the electrical
|
Plumbing Rough-in | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | PASS |
Dan Ediger
|
|
|
Picture on correction.
|
Plumbing Rough-in | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | FAIL |
Dan Ediger
|
|
|
Call ahead to meet // Randy Phone #: ###-#### use shielded bands or remove cast and replace with abs glue joints
|
Plumbing Rough-in | 7/5/2019 | 7/8/2019 | 7/8/2019 | A | FAIL |
Eric Strole
|
|
|
Randy-please call 30 minutes prior for access Phone #: ###-####-Need to vent tub & test dwv.
|
Application received | | | 6/11/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/11/2019 | | DONE |
|
|
|
|