Final | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Rigsby
|
Final | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | CANC |
Daryl Spivey
|
|
|
Inspection requested via web by Chris Adams
|
Plumbing Rough-in | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | PASS |
Dan Ediger
|
|
|
Inspection requested via web by Chris Adams
|
Plumbing Rough-in | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Adams 1. The 3" cleanout has to be above the floor or within 5 feet of the crawl. 2. A cleanout is required in the vertical above a santee cross or use a fixture fitting. 3. the DWV test faliled
|
Issue PAID IN FULL permit | | | 7/11/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/11/2019 | | DONE |
|
|
|
This permit was created on the web by Chris Adams
|