Final | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PASS |
Matt Wrobel
|
|
|
Please call Pat prior to arrival. Phone #: ###-#### Inspection requested via web by Maira Napoles
|
Plumbing Rough-in | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PART |
Matt Wrobel
|
|
|
Please call Pat prior to arrival at ###-####.thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles r.d.,,, bathroom rough and all vents pass
|
Groundwork | 8/28/2019 | 8/29/2019 | 8/29/2019 | A | PART |
Eric Strole
|
|
|
Patrick Phone #: ###-####-Piping from building to tanks & tank to tanks pass. Still need to test tanks.
|
Groundwork | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | FAIL |
Eric Strole
|
|
|
Please call Patrick prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles-Need to test tanks and piping.
|
Groundwork | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Matt Wrobel
|
|
|
Please call Pat prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles
|
Water and/or Sewer | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | CANC |
Matt Wrobel
|
|
|
Please call Rob prior to arrival at ###-####. Phone #: ###-#### Inspection requested via web by Maira Napoles
|
Groundwork | 8/9/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Matt Wrobel
|
|
|
rescheduled as a groundwork instead of sewer water main sewer line inside bldg
|
Groundwork | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PART |
Matt Wrobel
|
|
|
Please call Patrick when on-site at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles water and waste lines stubbed out of bldg past sidewalk minus main line running length of bldg ok to cover
|
Issue PAID IN FULL permit | | | 7/26/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/26/2019 | | DONE |
|
|
|
This permit was created on the web by Maira Napoles
|
First Notice | 12/23/2019 | 12/23/2019 | | | |
Matt Wrobel
|
|
|
|