PLM-Aging Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 | | PASS |
Eric Strole
|
|
|
|
DOC - Permit Finaled | 4/28/2020 | 4/28/2020 | 4/28/2020 | A | PASS |
Eric Strole
|
|
|
|
Sprinkler (Final) | 8/2/2019 | 8/2/2019 | 8/2/2019 | P | PART |
Eric Strole
|
|
|
Got Backflow tested and ready Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy-PVB has been tested.
|
Sprinkler (Final) | 8/1/2019 | 8/1/2019 | 8/1/2019 | A | PART |
Eric Strole
|
|
|
Tie in sprinkler with backflow device. Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy-Ok to cover, pvb needs tested.
|
Water and/or Sewer | 7/30/2019 | 7/30/2019 | 7/30/2019 | P | PASS |
Eric Strole
|
|
|
Correction one water on exterior kitchen wall for temporary. Contractor will finish fur out Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy
|
Water and/or Sewer | 7/30/2019 | 7/30/2019 | 7/30/2019 | A | PART |
Eric Strole
|
|
|
Phase 1 inspection - water main to house nd house plumbed with Pex. Second phase is Sprinkler branch later Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy-Waterlin ok to cover. Cannot have waterline in exteriour 2x4 wall.
|
Issue PAID IN FULL permit | | | 7/30/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/30/2019 | | DONE |
|
|
|
This permit was created on the web by Soubanh Senethavialy
|