Final | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol
|
Final | 12/7/2019 | 12/9/2019 | 12/9/2019 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol-Shower requires a threshold or make ada compliant per the 2017 ISPC.
|
Plumbing Rough-in | 8/6/2019 | 8/6/2019 | 8/6/2019 | A | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol-Vents are required to be 6 inches above flood level rim before tieing into other vents.
|
Issue PAID IN FULL permit | | | 7/30/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/30/2019 | | DONE |
|
|
|
This permit was created on the web by Rob Bristol
|