Final | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Denise Colin
|
Final | 10/14/2019 | 10/18/2019 | 10/18/2019 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Denise Colin. The gas line must be 3/4" and the meter may need to be upsized the handle the new load-verify.
|
Pressure Test | 10/14/2019 | 10/18/2019 | 10/18/2019 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Denise Colin
|
Final | 9/24/2019 | 9/26/2019 | 9/26/2019 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Denise Colin - need to witness a 5lb flue pressure test
|
Issue PAID IN FULL permit | | | 8/27/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 8/27/2019 | | DONE |
|
|
|
This permit was created on the web by Denise Colin
|