Final | 4/20/2020 | 4/21/2020 | 4/21/2020 | A | PASS |
Eric Strole
|
|
|
Phone #: 8019150400 >> Inspection requested via mobile web by Brad Hughes
|
Pressure Test | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Eric Strole
|
|
|
Brad Phone #: ###-####-20 lb gas test pass.
|
Plumbing Rough-in | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | PASS |
Eric Strole
|
|
|
Brad Phone #: 801-915-040-Plumbing rough-in pass.
|
Telephone call | | | 2/6/2020 | | DONE |
|
|
|
Rainy with John Zarbock wants to add gas pipping to the scope of work on this permit. Not going to change valuation and no new work is to be added. Should have been added to verbage when it was pulled and issued. Sent to plan reviewer for double check.
|
Groundwork | 11/4/2019 | 11/5/2019 | 11/5/2019 | A | PASS |
Eric Strole
|
|
|
Brad Phone #: ###-####
|
Groundwork | 10/30/2019 | 10/31/2019 | 10/31/2019 | P | NR |
Eric Strole
|
|
|
Brad- partial underground inspection Phone #: ###-####
|
Plumbing Rough-in | 10/29/2019 | 10/30/2019 | 10/30/2019 | P | CANC |
Eric Strole
|
|
|
Brad- partial underground inspection Phone #: ###-####
|
Groundwork | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | PART |
Eric Strole
|
|
|
Trunkline ok to cover. Test pass.
|
Application received | | | 10/28/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/28/2019 | | DONE |
|
|
|
|
First Notice | 4/21/2020 | 4/21/2020 | | | |
Eric Strole
|
|
|
|