Water and/or Sewer | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | PASS |
Daryl Spivey
|
|
|
Check for leaks at 22nd ; Hazel hole where connection into Suez was made.I would like to cover with soil. Suez meter has been installed and line is plugged in garage. Water is live according to Suez. Thx. Phone #: ###-#### Inspection requested via web by greg bauer
|
DOC - Permit Finaled | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | PASS |
Daryl Spivey
|
|
|
|
Water and/or Sewer | 12/20/2019 | 12/20/2019 | 12/20/2019 | A | PART |
Daryl Spivey
|
|
|
Inspect depth of water line at driveway Phone #: ###-#### Inspection requested via web by greg bauer ok to cover......except at meter for test........ds
|
Water and/or Sewer | 12/18/2019 | 12/19/2019 | 12/19/2019 | A | NR |
Eric Strole
|
|
|
Water Line at garage/driveway pad depth Phone #: ###-#### Inspection requested via web by greg bauer-Not ready
|
Water and/or Sewer | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | PART |
Eric Strole
|
|
|
Greg Phone #: ###-####-Need to lower waterline at driveway & sidewalk area.
|
Application received | | | 12/13/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/13/2019 | | DONE |
|
|
|
|