Final | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Brashears-Builbing B final ok.
|
Final | 6/24/2020 | 7/1/2020 | 7/1/2020 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Brashears-Need to test backflows.
|
Final | 6/24/2020 | 6/25/2020 | 6/24/2020 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jason Brashears Inspection cancelled from web by: Jason Brashears
|
Telephone call | | | 6/16/2020 | | DONE |
|
|
|
applicant emailed new values for Building A and Building B. See Docs
|
Telephone call | | | 6/15/2020 | | DONE |
|
|
|
contractor called to request permit split as they put the value for buildings a and b on this permit, but they need to close out buiding b before they can start building a. He is emailing me a summary of this request, with the individual values for building a and building b. I told him we cannot split the fees paid on two separate permits, and that he would have to pay the fee for the new permit for building a, and ask for a refund on what was over paid for building b.
|
Pressure Test | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Eric Strole
|
|
|
Gas piping pressure test for rooftop piping Phone #: ###-#### Inspection requested via web by Jason Brashears-20 lb gas test pass.
|
Pressure Test | 5/30/2020 | 6/1/2020 | 6/1/2020 | A | FAIL |
Eric Strole
|
|
|
Gas piping pressure test for roof top piping. Phone #: ###-#### Inspection requested via web by Jason Brashears-20 lb gas test fail.
|
Pressure Test | 3/13/2020 | 3/13/2020 | 3/13/2020 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Brashears-20 lb gas test from meter to w/h & stub up to roof pass.
|
Plumbing Rough-in | 3/13/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Brashears-Roof drains & rough-in pass.
|
Groundwork | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Brashears
|
Issue PAID IN FULL permit | | | 12/17/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 12/17/2019 | | DONE |
|
|
|
This permit was created on the web by Jason Brashears
|
First Notice | 7/1/2020 | 7/1/2020 | | | |
Eric Strole
|
|
|
|