Final | 4/20/2020 | 4/20/2020 | 4/20/2020 | P | PASS |
Eric Strole
|
|
|
Screened-requesting a video inspection if possible- Ryan Phone #: ###-####
|
Plumbing Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | PASS |
Eric Strole
|
|
|
Ryan Phone #: ###-####
|
Plumbing Rough-in | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | FAIL |
Eric Strole
|
|
|
RYAN Phone #: ###-####-Need to be 6" above flood level before going horizontal on kitchen vent & need to add c/o.
|
Application received | | | 12/31/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/31/2019 | | DONE |
|
|
|
|