Water Heater Final | 1/27/2020 | 1/29/2020 | 1/29/2020 | A | PASS |
Daryl Spivey
|
|
|
Please call Morgan when on the way over to the house Phone #: ###-#### Inspection requested via web by Aaron Alandt
|
Water Heater Final | 1/22/2020 | 1/24/2020 | 1/24/2020 | A | FAIL |
Dan Ediger
|
|
|
Please call Morgan when on the way over. Phone #: ###-#### Inspection requested via web by Aaron Alandt 1. Flue needs to grade 1/4" per foot to the tee wye. 2. Drill an 1/8" hole at the lowest point of the t&p drain. 3. Install CO detectors. 4. Check the flue height on the roof. 5. Turn off the drain valve. It's in the on position.
|
Issue PAID IN FULL permit | | | 1/22/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/22/2020 | | DONE |
|
|
|
This permit was created on the web by Aaron Alandt
|