Water and/or Sewer | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | PASS |
Dan Ediger
|
|
|
Spoke with the installation contractor. The pipe from the street up the hill was existing.
|
Final | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | PASS |
Dan Ediger
|
|
|
|
Water and/or Sewer | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | FAIL |
Dan Ediger
|
|
|
Dustin - */Screened*/ Phone #: ###-#### 1. The sewer below the retaining wall was run without and inspection. The connection needs to be witnessed. 2. A traffic rated cleanout cover is required at the base of the retaining wall.
|
Issue PAID IN FULL permit | | | 7/28/2020 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/28/2020 | | DONE |
|
|
|
This permit was created on the web by Dustin Ferdinand
|